No

Name of project

Size, Location

Total investment (billion VND)

Investment form

Proposing agency (State/Investor)

 

 

23 Projects

71,172

 

 

I

INFRASTRUCTURE

71,127

 

 

A

ROAD BRIDGE

53,788

 

 

A1

BRIDGE

 

14,108

 

 

1

Binh Trieu 2 Bridge and Road (Section 2)

1. Scale
- Part 1 Phase2: invest 230 billion VND to: (1) give to the City to pay the investment cost of Binh million 2 bridge of Cienco5, (2) repair Binh Trieu bridge 1), (3) install station Toll collection for Binh Trieu bridge 1. Part 1 is expected to be added in Phase2: VND 1,120 billion will be paid to the City for compensation and site clearance work.
- Completed Phase 2 project: additional investment of 480 billion VND to implement: (1) widening UVKhem road (with length of 1.8km and MCN of 30m); (2) construction of Crossroads for Martyrs' Crossroads (overpass in the direction of XVN Tinh - National Highway 13 with a length of 238m and a width of 9m, widening CVan road with a length of 200m and MCN with 23m); (3) expansion of Ong Dau bridge (02 new bridges on both sides of the existing bridge, with: total length of 160m, MCN of each new bridge is 5.25m).
- Dk: Phase 3 invests in the entire National Highway 13, 53m wide and long
 2. Location: Binh Thanh District, Thu Duc District

6,357

BOT 

TP Technical Infrastructure Investment Joint Stock Company (CII)

2

Phu My bridge

Cable-stayed reinforced concrete bridge, length 2100m, MCN 27.5m

2,914

BOT 

Phu My Construction Investment Joint Stock Company

3

Saigon Bridge 2

- Bridge cross section: 23.5m.
- Static: Height:H= 9.0m; Width of navigable compartment: B=80.0m; Underpass under the bridge H=4.75m
 - Global length L = 995.32m

1,827

BT

City Technical Infrastructure Investment Joint Stock Company (CII)

4

Thu Thiem Bridge 2

1,465m long including the path. Connecting Thu Thiem and District 1

3,010

BT

Dai Quang Minh

A2

STREET

39,680

 

 

5

Expanding Hanoi highway

1. Scale
- The section from Saigon Bridge to Binh Thai Intersection: 6,000m long; 153.5m wide = 2x5.0m (sidewalk) + 2x12m (parallel) + 2x22m (main road) + 75.5m (divider strip, green corridor, metro No. 1) to meet 16 lanes.
- The section from Binh Thai Interchange to the old Station 2 Interchange: 9700 m long; 113.5m wide = 2x5.0m (sidewalk) + 2x12m (parallel) + 2x18.5m (main road) + 42.5m (divider strip, green corridor), meeting 14 lanes.
- Main road axis: Main main street of Grade I, V=80km/h;
- Total investment: 2,516 billion VND (The compensation for site clearance 2000 billion is done separately).
- Total adjusted investment: 3,822,6462 billion VND (including 1,410 billion VND for compensation for site clearance in Binh Duong province)
 2. Location: District 2, District 9, Di An Town, Binh Duong Province

5,322

BOT 

City Technical Infrastructure Investment Joint Stock Company

6

Phase 1: Expanding National Highway 1, section An Suong - An Lac

1. Scale
- Phase 1 investment: building a 14km long route with 36.2m MCN and complete technical infrastructure system
- Phase2 investment: to build 02 more intersections of different levels at the intersections between NH1/TL10, QL1/TL10B and the median between motor vehicle lanes/ rudimentary vehicles on the route; additional investment in a number of items (renovating and expanding the intersection of National Highway 1-M1-Road No.7; renovating the road parallel to National Highway 1 and building green patches in traffic reserve land areas along the National Highway No. Highway 1; installation of vehicle load control system)
- Phase3 investment: building a different-level intersection at the intersection of National Highway 1/Huong Street 2
- Preparing to invest in the section from Tan Kien intersection to Long An province border and Go May intersection
2. Location: District 12, Binh Tan District, Binh Chanh District
 

4,484

BOT 

IDICO Infrastructure Development Investment Joint Stock Company (IDICO-IDI)

7

Construction of 04 main roads in Thu Thiem new urban area

1. Scale: to build 04 new main traffic routes R1, R2, R3, R4 with a total length of 11.9km, MCN from 11.6m ÷ 55m; build 10 bridges (including 2 viaducts) with a total length of 1.8km.
 2. Location: Thu Thiem New Urban Area, District 2

8,265

BT

Dai Quang Minh Real Estate Joint Stock Company

8

Technical infrastructure of Northern Residential Area (functional areas No. 3 and No. 4) and completion of North - South trunk road (section from the foot of Thu Thiem bridge 1 to Mai Chi Tho street) in Thu Thiem New Urban Area according to figure Form of Contract BT

1. Scale: build North-South trunk road with total length of 1,097m, MCN 44.7m; to build internal roads within functional zones No. 3 and No. 4 with a total length of 8,350m, MCN from 18.6-28.6m.
 2. Location: Thu Thiem New Urban Area, District 2

2,641

BT

City Technical Infrastructure Investment Joint Stock Company

9

Construction of a road connecting to Phu My Bridge

- The East Ring Road is 8,752.24m long, MCN: 67m
- The viaduct is 1,656m long.
 - Zone A intersection.

1,440

BT

Phu My Construction Investment Joint Stock Company

10

Road D3 connects to SG - Hiep Phuoc port

The road part is 1,800m long, the MCN has 4 lanes; Rach Rop II bridge is 300m long; Great Canal II bridge is 273m . long

293

BT

Investor: DDCity T Co., Ltd. Ngoc Vien Dong urban area

11

Road connecting Nguyen Duy Trinh street to Phu Huu industrial park

District 9

461

BOT 

Ha Tien 1 Cement Joint Stock Company

12

Tan Son Nhat Street - Binh Loi - Outer ring

1. Scale: length: 13,657km; 40m wide (including 2 branches from Truong Son to Nguyen Thai Son), 60m wide (from Nguyen Thai Son to Go Dua), 30m wide (from Do Dua to Linh Xuan intersection). On the route, there are 03 bridges: Binh Loi, Go Dua, Rach Lang; 06 pedestrian overpasses.
 2. Location: Tan Binh district, Go Vap district, Binh Thanh district, Thu Duc district

10,687

BT

GS Engineering & construction corp

13

Public passenger transport by waterway

Route 1 (Bach Dang - Linh Dong) is 10.8km long, 07 berths
 Route 2 (Bach Dang - Lo Gom) is 10.3km long, 07 berths

125

BOO

Investors participating in the selection process: Thuong Nhat Co., Ltd

14

Construction of parallel road to the south of HCMC - Long Thanh - Dau Giay expressway (section from An Phu intersection to Ring 2)

Total length of the route is 3,880m, MCN 14-20m including Ba Dat bridge (128.8m long), Muong Kenh bridge (359.1m long) with MCN 14.25m
 Location: District 2, District 9

869

BT

Investor: Nam Rach Chiec - Tien Phuoc joint venture

15

The connecting section from Pham Van Dong street to Go Dua intersection (NH1)

Line length: 2,750.82m. (the first point connects to Pham Van Dong street, the end point connects to Go Dua intersection (National Highway 1)); MCN 67m (08 lanes for motor vehicles and 06 lanes for mixed traffic); Phase 1: building 02 parallel mixed-vehicle branches.

2,955

BT

Investor: Joint Venture HNS VN Investment Joint Stock Company - Van Phu Invest Investment Joint Stock Company - Bac Ai Construction Investment Consulting Joint Stock Company

16

Road connecting Vo Van Kiet Street to Ho Chi Minh City - Trung Luong Expressway

 - Phase 1 has 04 lanes (14.5m on each side, including: 01 lane for motor vehicles, 01 lane for mixed traffic and sidewalks), the reserve land in the middle is 31m wide.

2,138

BOT

Yen Khanh Production, Trade and Service Co., Ltd

B

WATER SUPPLY - ENVIRONMENT - AQUATIC

12,469

 

 

17

Addressing tidal flooding in Ho Chi Minh City area taking into account climate change factors

Building 06 tidal control sluices: Ben Nghe, Tan Thuan, Phu Xuan, Muong Chuoi, Cay Kho, Phu Dinh and building 05 embankment sections at key positions, with elevation lower than tidal peak with a total length of 6,970 square meter

9,927

BT

Trung Nam Construction Joint Stock Company

18

Tham Luong - Ben Cat canal wastewater treatment plant (Phase 1)

Construction of a wastewater treatment plant with a capacity of:
- Phase 1: 131,000 m3/day and night
 - Phase 2: 250,000 m3/day and night

2,542

BT

Phu Dien Trading and Construction Investment Joint Stock Company

C

US Underground Parking

2,631

 

 

19

Underground parking at Le Van Tam park

 - Area occupied by surface land: 5,233.1m2; number of underground floors: 04;
- Capacity: 2,024 motorbikes, 1,260 tourist cars, 27 buses, trucks and minibuses.
 - Technology: Normal car arrangement.

1,748

BOT

Underground space development investment joint stock company

20

Underground parking at Drum Dong stage

 - Construction of 07 underground floors + 03 floating floors.
- Maximum number of car seats: 702 seats.
 - Technology: Normal car arrangement.

883

BOO

Dong Duong Group Co., Ltd

D

WATERWAY

1303

 

 

21

Improvement of Saigon river channel from Ben Suc port (Binh Duong) to Binh Loi bridge

Scale: Dredging the Saigon river channel from Ben Suc port to Binh Loi bridge (71km) + Building a new Binh Loi railway bridge with a length of 1.3km.
 Location: Binh Duong province, HCMC

1,303

BOT

Joint Venture GUD-STD

E

FACILITIES - URBAN CHANGE

936

 

 

22

Construction of internal technical infrastructure in Zone I (Ancient Zone) of Ethnic Culture and History Park, District 9

- Leveling is about 25,016ha.
- New construction of about 8,121m hot asphalt concrete road, width from 12m to 78m (6m ÷ 64m wide).
 - Construction of walkways; parking lot; system of sidewalk greenery, park trees, watering system; Lighting systems; reinforced concrete bridge (through Dong Tron canal)...

936

BT

Duc Khai Joint Stock Company

II

CULTURE - SPORTS

45

 

 

23

Building a cinema complex at the Cultural Center of District 12

 - Scale: Including 01 block with 01 ground floor, 02 floors, arranged from 06 to 08 cinema rooms and ancillary items such as lobby, stairs, toilet, office, warehouse;
- Construction area: 1600m2
- Building height: 23.33m.
 - Location: No. 09 National Highway 22, Trung My Tay Ward, District 12, Ho Chi Minh City.

45

BOT 

Linh Thanh Tuyen Co., Ltd